粉色视频APP下载,粉色软件下载精品黄色,粉色视频污污破解版,粉色视频成人在线免费看

News

News

Home| News| News

Hengtong have successfully completed the installation of the latest-model large capacity WTGs of Bozhong-A 501MW Offshore Wind Farm

2022-9-15 5075 Font size:

Hengtong has installed the first wind turbine of the Bozhong Off-shore Wind Farm’s Site A project, setting a new milestone after last year’s record of installing 12 deep sea wind turbines within one month. It is estimated that the Site A project, which scales 60 sets of H220-8350 wind power generators with a capacity of 501 MW, will provide 1.698 billion kWh green power every year, saving some 519,800 tons of coal equivalent and cutting 1,257,700 or so tons of CO2 emissions.


Utilizing our strong installation competence, qualified solution and professional crew, Hengtong provides comprehensive services for offshore wind power globally; and higher capabilities are soon expected to be added.


Hengtong never stops greening the world with its expertise.

 

1663202330933.jpg

網站地圖粉色网站在线观看 粉色影院黄色视频 粉色视频免费版观看入口 麻豆高清免费国产一区 香蕉视频下载地址 羞羞答答网站 91看片地址 午夜福利电影院